Opens in a new tab

Video

Line 5 Tunnel: A False Solution for Michigan Livestream

  1. Pipeline Icon

    Line 5 Pipeline

November 13, 2025

This livestream recording delves into the contentious debate surrounding the proposed tunnel for Enbridge’s Line 5 pipeline under the Straits of Mackinac.

Presenting a critical analysis of the environmental risks and potential consequences of the project, arguing that the tunnel is not a viable solution to the issues of oil transportation and spill prevention in the region. We need a reevaluation of our reliance on fossil fuels and to advocate for protective measures that prioritize environmental safety over corporate interests.

Share!

Authored by

Denise Keele Ph.D. portrait image for professional profile.

Denise Keele Ph.D.

Michigan Climate Action Network

Executive Director